Corridor drilled and cased a total of eight McCully wells in 2008 (including the K-48, C-48, P-67, C-57 and J-47 wells, as well as the deepening of the E-67b exploration well and the drilling of two horizontal wells at N-66 and I-47). Three wells were drilled and cased in 2009 (including C-29, P-47 and L-38) as located on the map below. Three wells (P-47, L-38 and the I-47) were fracced with propane in the summer of 2009. Reservoir testing of the P-47 and L-38 wells suggests that each of these wells have an estimated initial production capacity of about 10 mmscf/d.

Map showing location of McCully wells, gas gathering system and gas plant.